Chapter 2 · Aurubis2•1
Scrap yard management
Yard management for a multi-plant copper scrapyard, in the client's languages: one program that carries a delivery from planning, through check-in, weighing, drop-off and sampling, to the invoice.
Kevin worked full-stack on the yard flow and introduced new technology at the client. With the team, he moved the back end from .NET Framework to .NET 6.
- Client
- Aurubis
- Role
- Full-stack developer
- Period
- 2021–2023 · 19 mo
- Team
- 3–5
Wiring key
Scrap yard management2•2
One delivery going round the scrap yard in six steps, all of them in the same yard management program: the delivery is planned, the driver checks in, the truck is weighed, the copper is dropped off, then sampled and inspected, and the invoice is sent. Checking in, weighing, dropping off and sampling happen on the yard; planning and invoicing happen only in the program.
- 1PlanPlanned in the program before the truck sets off
- 2Check inThe driver checks in on arrival
- 3WeighThe weight goes on the delivery
- 4Drop offThe copper is tipped off in the yard
- 5SampleSampled and inspected; the results go on the delivery
- 6InvoiceMade up from the delivery and sent
Notes
- The back end moved from .NET Framework to .NET 6 as a team effort: the new back end was built side by side with the old one, then the yard cut over to it.
- As a Zinderlabs consultant at Rekencentra, on a project for Aurubis.